INFRASTRUCTURE / PROJECT 9612
Granville Bridge South Approach Ramps
Asbestos abatement of asphalt at selected expansion joints.

THE WORK
Our scope.
- Asbestos abatement of asphalt at selected expansion joints.
- Sawcutting along the marked pavement removal limits.
- Selective chipping and removal of asphalt at the joints.
Project conditions.
- Phase 1 rehabilitation at individual expansion joints on the south approach bridge deck.