INFRASTRUCTURE / PROJECT 8808

BC Ferries FMU Development

Structural demolition of multiple buildings.

BC Ferries FMU Development — project photograph 1.

THE WORK

Our scope.

  • Structural demolition of multiple buildings.
  • Selective interior demolition for renovations: walls, ceilings, framing and insulation.
  • Hazardous waste removal, including asbestos-containing transite board.
  • Concrete slab and foundation removal; cutting and coring.
  • Hand and machine trench excavation; asphalt removal.
  • Waste sorting, bin loadout, trucking and disposal.

Project conditions.

  • Multi-year, phased work at an active commercial dock.
  • Work around retained electrical and sprinkler systems.

YOUR NEXT PROJECT

Let’s get to work.

Discuss a similar project