Granville Bridge and North Loops
Complete demolition of both North Loop ramps and the former taxi building.

THE WORK
Our scope.
- Complete demolition of both North Loop ramps and the former taxi building.
- Selective removal of part of the bridge superstructure.
- Abatement of asbestos-containing asphalt on the structures and portions of the bridge.
Project conditions.
- Approximately 11,270 tonnes of concrete and 113,100 sq. ft. of asbestos-containing asphalt.
- Technical demolition in a dense downtown work area.
- Division 2 scope completed October 2024; combined D2C/D2E delivery.