INFRASTRUCTURE / PROJECT 8939
BC Hydro Capilano Substation
Structural building demolition and concrete footing removal.

THE WORK
Our scope.
- Structural building demolition and concrete footing removal.
- Asbestos pipe and caulking abatement, with encapsulation.
- Concrete duct-bank breakout and pipe separation.
- Contaminated soil handling and debris loadout.
- Excavation, backfilling, grading and compaction.
Project conditions.
- Fenced demolition footprint beside existing substation infrastructure.
- Asbestos-containing pipes embedded in concrete duct banks and block walls.
- Mechanical breakout coordinated with manual separation, bagging and water misting.
FROM THE PROJECT
In the field.