West Vancouver Municipal Hall Seismic Upgrade
Hazardous materials abatement, selective demolition and structural demolition across four floors.

THE WORK
Our scope.
- Hazardous materials abatement, selective demolition and structural demolition across four floors.
- Excavation below the existing slab to access foundations and footings for underpinning.
- Abatement of asbestos-containing flooring, drywall, window glazing and caulking, pipe and duct materials, and lead-painted materials.
Project conditions.
- Phases 1 and 2 of the municipal hall upgrade.
- Excavation approximately 9 metres below the existing slab.
FROM THE PROJECT
In the field.