INSTITUTIONAL / PROJECT 8215

Nanaimo Correctional Centre Replacement

Full demolition of 23 buildings and three greenhouses across approximately 194,700 sq. ft.

Division 2 machine demolition at the facility.

THE WORK

Our scope.

  • Full demolition of 23 buildings and three greenhouses across approximately 194,700 sq. ft.
  • Removal of asbestos-containing and lead-painted materials, including flooring, drywall, roofing, pipes, windows and duct mastic.
  • Structural demolition, debris handling and loadout.

Project conditions.

  • Portion of work inside the secure correctional perimeter.
  • 11,500 sq. ft. of asbestos-containing flooring and 10,700 sq. ft. of asbestos-containing drywall.
  • Approximately 22,970 tons of concrete.
  • Division 2 scope completed December 2024; combined D2C/D2E delivery.

YOUR NEXT PROJECT

Let’s get to work.

Discuss a similar project