INSTITUTIONAL / PROJECT 8215
Nanaimo Correctional Centre Replacement
Full demolition of 23 buildings and three greenhouses across approximately 194,700 sq. ft.

THE WORK
Our scope.
- Full demolition of 23 buildings and three greenhouses across approximately 194,700 sq. ft.
- Removal of asbestos-containing and lead-painted materials, including flooring, drywall, roofing, pipes, windows and duct mastic.
- Structural demolition, debris handling and loadout.
Project conditions.
- Portion of work inside the secure correctional perimeter.
- 11,500 sq. ft. of asbestos-containing flooring and 10,700 sq. ft. of asbestos-containing drywall.
- Approximately 22,970 tons of concrete.
- Division 2 scope completed December 2024; combined D2C/D2E delivery.