RECREATION / PROJECT 8537HB
Old Delbrook Community Recreation Centre
Hazardous materials abatement and interior strip-out.
THE WORK
Our scope.
- Hazardous materials abatement and interior strip-out.
- Structural demolition of two buildings; removal of slabs, footings and asphalt.
- On-site concrete crushing and rebar separation.
Project conditions.
- Approximately 40,000 sq. ft. of demolition.
- Crushed concrete retained on site for grading.
- Residential setting beside a daycare.
- Division 2 served as prime contractor; completed March 2023.