RECREATION / PROJECT 8537HB

Old Delbrook Community Recreation Centre

Hazardous materials abatement and interior strip-out.

THE WORK

Our scope.

  • Hazardous materials abatement and interior strip-out.
  • Structural demolition of two buildings; removal of slabs, footings and asphalt.
  • On-site concrete crushing and rebar separation.

Project conditions.

  • Approximately 40,000 sq. ft. of demolition.
  • Crushed concrete retained on site for grading.
  • Residential setting beside a daycare.
  • Division 2 served as prime contractor; completed March 2023.