RECREATION / PROJECT 9922
Nanaimo Aquatic Centre HVAC Renewal
Selective demolition of upper and lower bulkheads.

THE WORK
Our scope.
- Selective demolition of upper and lower bulkheads.
- Concrete slab and localized concrete removals.
- Sand grading to prepare for new footings.
- Concrete debris handling and bin loadout.
Project conditions.
- HVAC electrification and renewal, with concrete removal and footing preparation in the pool area.
- Mini excavators and handheld breakers used for removal.
FROM THE PROJECT
In the field.






YOUR NEXT PROJECT




