EDUCATION / PROJECT 8317
University of Victoria Queenswood Retreat Centre
Hazardous materials abatement and full demolition of the retreat centre and pool building.

THE WORK
Our scope.
- Hazardous materials abatement and full demolition of the retreat centre and pool building.
- Renovation work to the chapel.
- Abatement of asbestos-containing flooring, concrete parging, textured ceiling coating, drywall, windows and associated mechanical equipment.
Project conditions.
- Approximately 35,300 sq. ft. of demolition and 3,960 tonnes of concrete removed.
FROM THE PROJECT
In the field.






YOUR NEXT PROJECT




