INDUSTRIAL / PROJECT 9980

Seaspan VSY Compressed Air Expansion

Exterior metal cladding and insulation removal.

Seaspan VSY Compressed Air Expansion — project photograph 1.

THE WORK

Our scope.

  • Exterior metal cladding and insulation removal.
  • Removal of doors, overhead doors and windows.
  • Cutting for new door and mechanical louvre openings.
  • First aid room strip-out, including ceiling and roof framing.
  • Removal of masonry walls, partitions, flooring and fixtures.
  • Debris loadout, hauling and disposal.

Project conditions.

  • Selective demolition around retained steel framing and services at the shipyard.
  • Boom and scissor lift access for elevated work.
  • Temporary dust protection beside the mezzanine.

YOUR NEXT PROJECT

Let’s get to work.

Discuss a similar project