THE WORK
Our scope.
- Selective interior demolition and finish removal.
- Concrete cutting and demolition of the water feature, stairs and lobby floor.
- Asbestos-containing ductwork removal, including mastic at joints and connections.
- Concrete loadout, bin handling and waste staging.
Project conditions.
- Large indoor concrete water feature removed in cut sections with mechanical handling.
- Elevated ductwork removal within existing steel framing, using a boom lift.
- Night work scheduled around indoor noise restrictions.