HEALTHCARE / PROJECT 9384
Abbotsford Mental Health Centre
Selective removal of drywall, steel studs and insulation.

THE WORK
Our scope.
- Selective removal of drywall, steel studs and insulation.
- Removal of doors, frames, selected glazing and millwork.
- Removal of flooring, ceilings and plumbing fixtures.
- Localized concrete cutting and floor openings.
- Demolition debris handling and bin loadout.
Project conditions.
- Phased renovation work included after-hours demolition.
FROM THE PROJECT
In the field.






YOUR NEXT PROJECT




